For the best service and most economical quote, please contact us at:  (305) 868-4707  


 Ted Berman and Associates LLC

 CONSULTING ENGINEERS

 

 

You can add HTML directly into this element to render on the page.

Just edit this element to add your own HTML.

free hit counter

FLORIDA PRODUCT APPROVAL CONSULTANTS

​MIAMI DADE NOA

FLorida local approval

Is your Product being used for a site specific purpose, or a one-time approval, or is the product outside the scope of the Florida Product Approval Rule? We can help, providing assistance to obtain a Florida Local Approval. Call us for details!

Miami-dade county noa

Ted Berman was in charge of Miami-Dade County Product Control Division for 6 years. Implemented the NOA data base online. Implemented the Quality Assurance in accordance with Florida Product Approval Rule Requirements.

FLorida product approval

Ted Berman and Associates served as the Florida Product Approval Administrator for 9 consecutive years. Staff reviewed over 50,000 product approval applications with over 200,000 products.


  • FLORIDA PRODUCT APPROVAL VALIDATIONS
  1. Certification Mark or Listing Method
  2. Evaluation by a Florida PE Method
  3. Test Report Method
  4. Administrative Validation
  5. Technical Validations and Installation Instruction Verification
  • PRODUCT DESIGN
  1. Guide the manufacturer in having the most economical product design
  2. Product Approval Management
  3. Installation Instructions
  • SITE SPECIFIC DESIGN
  1. Local Approvals
  2. One time Approvals




PRODUCT APPROVAL 

  • PRODUCT APPROVAL MANAGEMENT
  1. Code Compliance/Test Protocols
  2. Comparative and/or Rational Analysis
  3. Product Evaluations 
  4. Installation Instructions
  5. Online Application Submittal 
  • PRODUCT APPROVAL EVALUATIONS
  1. Comparative and/or Rational Analysis
  2. Anchor Calculations
  3. Analysis of Test Data
  4. Florida Product Approval Evaluations
  5. Miami-Dade County Product Approval Evaluations
  • PRODUCT APPROVAL INSTALLATION DRAWINGS
  1. Installation Instructions in accordance with Rule 61G20-3
  2. Including attachments and anchorage requirements
  3. Substrate analysis  




Google+